Home Sitemap ThyssenKrupp Group
ThyssenKrupp Steelcom
Services Products About Us Privacy Policy ThyssenKrupp Group Sitemap Sale & Hire Contact Us Downloads ThyssenKrupp Steelcom ThyssenKrupp Steelcom ThyssenKrupp Steelcom
Sale & Hire Contact Us Downloads Services Products About Us

 Go to Driving the Future Piling Symposium Video Footage

Driving the Future
Piling Symposium
Video Footage

 

 

Job Reports > Trench Shoring > Krings KS 100

Krings KS 100
Relocation of 8000 U.S. Marine
Black Constructions
Guam USA

Trench Shoring, the process of bracing the walls of a trench in order to prevent collapse, has been part of the recent investment of BCC.

Black Construction Corporation (BCC), Guam - the most experienced and largest construction company in the Western Pacific purchased KS 100. BCC has a successful history of construction projects which encompass multi-discipline and project management requirements in civil, structural, architectural, mechanical and electrical engineering.

KS 100 were purchased to be used for the extensive upgrades to water, waste water and sewer systems throughout the island, pending the million dollar military construction project. The trenchboxes also comply with the State and Local OSHA laws and safeguard BCC employees in difficult working conditions.

The KS 100 is the world's most frequently used trench box. Its uncomplicated use in countless variations in terms of trench width, assignment depth, lengths available on site and conventional vertical pipe clearances (up to 1.56 m) make all settings possible within the quoted maximum sizes. Its most cost-effective use is in trenches up to about 4m wide.

As on all KRINGS trench boxes, working with KS100 is very straightforward inexpensive, safe and reliable. No disturbance to the environment is caused by driving or vibration.

ThyssenKrupp Steelcom offers total piling solutions including hire and sell of steel sheet piles, impact and vibratory piling hammers ranging from excavator mounted to large crane suspended units, as well as, foundation equipment and trench shoring.

Trench Shoring - Krings KS100 - The KS 100 is a versatile trench box for a wide range of shoring tasks. 

Click here for a printable copy and to view the Job Report as a pdf

For further information on trench shoring, contact:
Tony Milhench |Sales QLD
QLD – Shoring / Trench Boxes

Phone: +61 7 3804 5200
Mobile: +61 0 428 699 986
Fax: +61 7 3386 1148
Email: tony.milhench@tk-steelcom.com.au

Martin Cross |Business Development Manager
QLD – Shoring / Trench Boxes

Phone: +61 7 3804 5200
Mobile: +61 0 407 671 200
Fax: +61 7 3386 1148
Email: martin.cross@tk-steelcom.com.au

PO Box 1758
Mudgeeraba QLD 4213


Technical Sales on Sheet Piles - 02 9409 1777
Piling Machineries/Equipment - 02 4966 0688
or email: enquiries@tk-steelcom.com.au

 


  Privacy Policy | Sitemap
      Copyright © by ThyssenKrupp Steelcom